Mesaieed Power Company Ltd
Azizar Rahman possesses extensive experience in the power industry, currently serving as a Control Room Engineer at Mesaieed Power Company Ltd since September 2008. Prior to this role, Azizar worked as a Shift Charge Engineer at Mymensingh Power Station from 2005 to April 2008. Azizar holds a Bachelor's degree in Electrical and Electronics Engineering from Khulna University of Engineering and Technology (KUET), completed between 1994 and 1998.
This person is not in any offices
Mesaieed Power Company Ltd
2000 MW Combined Cycle Gas Turbine Power Plant. Operates 6 nos GE 9 FA Gas turbine, 3 no D11 GE Steam turbine, 2 no 6B GE Gas turbine. 400KV GIS Sub Station. 3 Cooling Tower, One auxiliary Boiler, One water treatment plant by Reverse Osmosis Process, One clorination plant, using portable hydrogen cylinder for generator cooling.