Jorge Salas

Geotechnical & Tunnel Design Engineer

Jorge Salas is a Geotechnical & Tunnel Design Engineer currently working at Sener since December 2022, where contributions include leading tunnel design projects such as the Scarborough Subway Extension and the Panama L3 and Dubai Blue Line Metro projects. Prior to this role, Jorge worked at STRABAG from February 2020 to December 2022, focusing on high-profile infrastructure projects including HS2 and various tunnel designs. Experience also includes a position as a Tunnel Engineer at Jacobs and a Geomechanical Engineer at SYSTRA Subterra and Collahuasi. Jorge holds multiple advanced degrees, including an MSc in Soil Mechanics from Imperial College London and two Master's degrees in Mining Engineering from Universidad Politécnica de Madrid and Pontificia Universidad Católica de Chile, supplemented by an exchange year at the Norwegian University of Science and Technology.

Links

Previous companies


Org chart

This person is not in the org chart


Teams

This person is not in any teams


Offices

This person is not in any offices