Christopher Orr

Production Supervisor at Signicast Investment Castings

Christopher Orr is an experienced production and warehouse management professional with a career spanning over a decade. Currently serving as a Production Supervisor at Signicast Investment Castings since May 2017, Christopher has previously held supervisory roles at Chr. Hansen Holding A/S, Shur-Line, Palermos Pizza, and CSM Bakery Products, demonstrating a strong ability to manage teams and optimize production processes. Christopher has been recognized for exceptional problem-solving skills and commitment to safety, with multiple promotions and accolades throughout tenure at various organizations. Education includes studies at Bryant & Stratton College from 2011 to 2013.

Location

Milwaukee, United States

Links

Previous companies


Org chart

No direct reports

Teams

This person is not in any teams


Offices


Signicast Investment Castings

Signicast Investment Castings, a world-class provider of commercial steel investment castings provides customers a quality product on time at a competitive price. With quick lead times, on-time delivery, true just-in-time manufacturing, and unrivaled process control, Signicast has quickly become the top choice for OEM components in a wide range ofmarkets. In an industry where 12-week lead times are standard, Signicast has reduced that time to just 1 to 4 weeks. The result is true Just-In-Time manufacturing which eliminates costly inventory by allowing customers to receive small quantities of product, delivered frequently, according to their production schedule. Orders, even small ones, go from entry to shipping with no interruptions. Signicast operates 24 hours a day, seven days a week and schedules remain on-time. Signicast offers the best total value option for Complete-to-Print components. Signicast provides secondary operations such as machining, heat treatment, assembly, painting, finishing and packaging. The result is a high quality, high value product that is ready to ship from Signicast docks in as few as 4.3 days from start to finish. Early supplier involvement allows Signicast’s in-house technical staff to provide concurrent engineering during the formative stage of product design. Signicast’s engineering team is dedicated to providing customers with a design that will result in the lowest overall cost with design for manufacturability.