ASTURFEITO
Eliseo Alvarez Pozueco is a seasoned project management professional with extensive experience in leading projects across various companies. Currently serving as Jefe de Proyecto and Coordinador de Proyectos at ASTURFEITO since March 2022, Eliseo has previously held roles as Project Manager at DF-Duro Felguera from February 2014 to June 2022 and at PHB Weserhütte, S.A. from November 2008 to January 2014. Prior experience also includes positions as Jefe de Proyecto at MODULTEC S.L. and DF-Duro Felguera, along with a solid educational background that includes a Máster Universitario en Energías Renovables from Universidad Europea and a degree as Ingeniero Técnico en Topografía from Universidad de Oviedo.
This person is not in the org chart
This person is not in any offices
ASTURFEITO
Asturfeito was founded in 1989 as a capital goods supplier for the local mining and steel industry. Originally located at Silvota and later at Tabaza industrial area, Asturfeito started an ambitious international expansion in 1999 and at the same time expanded its services to high demanding markets such as oil&gas, nuclear and defense. In 2007 a second large manufacturing and assembly workshop was inaugurated in Aviles PEPA area, boosting the latest technology and manufacturing means. After additional expansions and upgrades nowadays Asturfeito operates four manufacturing workshops with a total indoor surface of 32.000 m2 all coordinated from our 2.000 m2 HQs office inaugurated in 2019. Our goal is to become the preferred manufacturing partner for the leading companies in each of our sectors. Through the combination of high flexibility, skilled workforce and the latest manufacturing technology we are ready to participate in the most challenging projects with the highest commitment of quality, safety and environmental & social responsibility. Asturfeito workshops occupy a total under roof surface of 32.000 m2. All manufacturing bays are equipped with heavy overhead cranes and state-of–the-art welding, machining and testing equipment. Assembly bays with 25 m. under-hook height enable us to deal with the largest projects in the industry. Our comprehensive workshop distribution with dedicated areas for welding, machining, coating, assembly and testing, together with a segregated clean area for stainless steel processing, ensures a safe and efficient management of the projects. Our location with direct access to Aviles International Port allows the trouble-free shipping of large fully assembled and integrated equipment in one single piece.