Ravi Ranjan Kumar is an experienced professional in the engineering sector, currently serving as a Manager at Coal India Limited since September 2010, where responsibilities include overseeing the Erection, Commissioning, and Trial Run of a 16MTY CHP with SILO Loading arrangement by L&T at Lingaraj OCP. Prior roles at Coal India Limited include Deputy Manager and Assistant Manager, with a focus on the power supply department, including substation, cabling, transmission, and distribution. Additionally, a summer training experience at NTPC provided insights into power generation processes and led to the successful completion of a small project. Ravi holds a B.Tech. in Electrical Engineering from the National Institute of Technology Jamshedpur, completed in 2010.