RG

Roy Guerra

Pipeline Controller at Genesis Energy

Roy Guerra has a diverse work experience spanning over several decades. Roy started their career in 1988 as a Process Operator at Genesis Energy, L.P. for a period of 15 years. During this time, they were responsible for monitoring and operating unit operations, maintaining equipment, and recording temperatures and pressures.

In 2003, Guerra transitioned into a Training Coordinator role, where they developed training plans and materials, conducted new hire orientations, administered the Learning Management System (LMS), and wrote and revised operating procedures. Roy held this position until 2010.

From 2010 to 2011, Guerra worked as an R&D Technician at SunEdison. Roy was part of a team responsible for the start-up of a pilot plant process and the preparation of new equipment during the final stages of construction.

Guerra then took on the role of Control Room Operator and Process Coordinator at SunEdison from 2011 to 2016. In this position, they remotely monitored and executed processes using a distributive control system, coordinated daily planned activities, and supervised the operation of up to 11 reactors and other ancillary equipment.

Following their time at SunEdison, Guerra joined RW Smith as a Logistics Specialist from 2016 to 2018. Finally, they returned to Genesis Energy, L.P. in 2018 as a Pipeline Controller, although specific information about this role's responsibilities and duration is not provided.

Overall, Roy Guerra has demonstrated expertise in process operations, training coordination, logistics, and pipeline control throughout their career.

Roy Guerra has an Associate's Degree in Business from Lone Star College. Additionally, they have obtained a Transportation Worker Identification Credential (TWIC) from the Transportation Security Administration (TSA) in March 2016. Roy also has a certification in Process Operations from San Jacinto College, but the specific month and year of obtaining this certification are unknown.

Links


Org chart

Timeline

  • Pipeline Controller

    2018 - present