Tonaquint Data Centers
Chris Howard has a strong background in sales and management. Chris began their career at Apex Alarm in 2003, where they sold home security systems and achieved notable success, being awarded the national "Top 30 sales reps status." Chris then moved on to Hardwoods Specialty Products in 2005, where they increased sales revenue by 30% in the Salt Lake territory. Following that, Chris worked at Riverwoods Mill as a Sales/Design Engineer and later as an Installation Manager. Currently, they are employed at Tonaquint Data Center, Inc as the VP of Sales for the Data Center division.
Chris Howard attended Westminster University from 2000 to 2004, where they earned a degree in Business Management. Chris also attended Brigham Young University - Idaho from 2000 to 2002, earning an Associates Degree in Business Management.
Tonaquint Data Centers
Tonaquint, established 2008 in St. George, UT. TDC offers over 20,000 sq. ft. of data center space in our current facility located in the Tonaquint Business Park. Facility Size: Approximately 28,000 square feet Completed: 3rd Quarter, 2008. Raised floor area is 17,200 usable square feet. Floor Load: Typical structural capacity of 1250 pounds per square foot. Building Access: 24x7x365, Building Security: Video surveillance at all building entrances Shipping and receiving dock with remote monitored gate and secured storage Private parking area for all emploees and customers Monitored visitor parking Telecommunications: Zayo UTOPIA Tonaquint Century Link TDS Telecom South Central Level(3) Communicatoins Electric Lightwave Telecom Commercial Power: Utility Power 25MW primary substation 15MW secondary substation Total power plant 4MW Fuel Tank: Fuel storage for minimum 48-hr run time. Currently, 6,000+ gallons on site. Generators: Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units. Entire generator plant designed at N+1 redundancy. Fire Supression: FM200 VESDA (Very Early Smoke Detection Alarm) above and below floor. Double interlock pre-action throughout. HVAC: DX30 ton computer room air conditioner units. N+1 redundancy on all systems. Ceiling Heights: Typically finished 10 feet from raised floor.