Kolby Traveller

Kolby Traveller has a diverse work experience. Kolby first worked at Tonaquint Data Center, Inc in 2010, where they focused on business development. Previously, they worked as a licensed real estate agent/associate broker at Stone Cliff Properties Inc from 2008. At Stone Cliff Development, they were a heavy machinery operator between 2004 and 2006. Kolby also worked as an orchestra pit musician at Tuachan Center for the Arts from 2002 to 2003. Additionally, at Tonaquint Data Center, they were involved in security and operations between 2008 and 2011. In another role at Data Center, they served as an operations (NOC) manager from 2009 to 2010.

Kolby Traveller attended Dixie State University from 2008 to 2011, where they studied Business Administration. In 2009, they also attended Stringham Real Estate School and obtained a Utah Real Estate Sales Agent degree. Additionally, Kolby Traveller has some involvement with Western Governors University, but the specific details regarding start and end dates or field of study are unknown.

Location

St. George, United States

Links


Org chart


Teams


Offices


Tonaquint Data Centers

Tonaquint, established 2008 in St. George, UT. TDC offers over 20,000 sq. ft. of data center space in our current facility located in the Tonaquint Business Park. Facility Size: Approximately 28,000 square feet Completed: 3rd Quarter, 2008. Raised floor area is 17,200 usable square feet. Floor Load: Typical structural capacity of 1250 pounds per square foot. Building Access: 24x7x365, Building Security: Video surveillance at all building entrances Shipping and receiving dock with remote monitored gate and secured storage Private parking area for all emploees and customers Monitored visitor parking Telecommunications: Zayo UTOPIA Tonaquint Century Link TDS Telecom South Central Level(3) Communicatoins Electric Lightwave Telecom Commercial Power: Utility Power 25MW primary substation 15MW secondary substation Total power plant 4MW Fuel Tank: Fuel storage for minimum 48-hr run time. Currently, 6,000+ gallons on site. Generators: Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units. Entire generator plant designed at N+1 redundancy. Fire Supression: FM200 VESDA (Very Early Smoke Detection Alarm) above and below floor. Double interlock pre-action throughout. HVAC: DX30 ton computer room air conditioner units. N+1 redundancy on all systems. Ceiling Heights: Typically finished 10 feet from raised floor.


Industries

Employees

11-50

Links