Toronto Hydro
Kostandino Lykos, P.Eng, is an experienced engineer specializing in stations and distribution automation at Toronto Hydro since May 2019. Responsibilities include developing operational and capital budgets, preparing reports on battery sizing standards and long-term load forecasting, and overseeing a $20 million budget for the Transformer Stations portfolio. Prior experience includes roles at METSCO Energy Solutions, where Kostandino monitored feeder reliability and conducted loading analysis for Sunnybrook Hospital, and as a Junior Electrical Engineer at ANDRITZ HYDRO Pvt. Ltd., where a VBA tool was developed to optimize electromagnetic designs. Early career experience includes serving as a Senior Technical Student at Toronto Hydro, where contributions involved reliability analysis and project design. Kostandino holds a degree from Ontario Tech University, earned between 2012 and 2017.
This person is not in the org chart
This person is not in any teams
This person is not in any offices