Femern Link Contractors (FLC)
Artur Meșină is an Engineering Coordinator at Femern Link Contractors since January 2022, responsible for ensuring project success through design, construction, and maintenance coordination, along with cost evaluations. Prior experience includes roles such as Site Engineer, where Artur coordinated the construction process for a 1300-employee village area, and Engineering Laboratory Manager at Delta M.C.M. 93, focusing on quality control systems. Artur also worked as a Laboratory Engineer, conducting quality control of construction materials, and held various student positions in warehousing and kitchen roles. Educational qualifications include a Bachelor of Engineering in Civil Engineering and an MBA in Business/Managerial Economics from the Universitatea Tehnică a Moldovei.
This person is not in the org chart
This person is not in any teams
Femern Link Contractors (FLC)
The Fehmarnbelt Fixed Link will consist of a motorway and rail connection including a 18 km long tunnel that will allow travelling faster and safer between Scandinavia and continental Europe. It will be the world’s longest immersed tunnel and the longest tunnel for both road and rail traffic. Consortium: Femern Link Contractors (FLC) Contractors: Vinci Construction Grand Projets Aarsleff Soletanche Bachy Max Bögl BAM Infra BAM International Wayss & Freytag Ingenieurbau AG CFE Dredging International