Tim Ford

Site Safety Manager at Haskell Corporation

Tim Ford is a seasoned safety and project management professional with extensive experience in the construction and fabrication industries. Currently serving as Site Safety Manager at Haskell Corporation since September 2017, Tim has previously held the role of Shop Project Manager at TARSCO, Inc., where responsibilities included oversight of a fabrication shop and safety training. Tim's career spanned over three decades at CB&I, where various HSE and construction supervisory positions were held. Educational credentials include a High School Diploma from Sutter Union High School and further studies at the University of San Diego Extension from 2006 to 2009.

Location

Yorkville, United States

Links

Previous companies


Org chart


Teams

This person is not in any teams


Offices

This person is not in any offices


Haskell Corporation

1 followers

Haskell Corporation is a heavy industrial, general contractor and fabricator located in Bellingham, Washington. Started in 1890 and now in its 5th generation of continuous Haskell family management, Haskell continues to expand our capabilities. We perform a wide variety of EPC, Design-Build, Construction Management as well as field and shop fabrication construction services to clients in power, pulp and paper, renewable energy, manufacturing & processing, ASME assemblies and structural steel fabrication. We are well known for our ability to perform on very short notice, to perform effectively in very remote and difficult environments and to efficiently manage projects that require a high level of logistical expertise. Our project sizes range from several thousand dollars to over 100 million dollars. Haskell has the ability to self-perform the following construction activities: * Excavation * Forming & Concrete * Imbeds & Rebar * Structural Steel Fabrication * Structural Steel Erection * Mechanical Equipment Installation including boilers, vessels, drums, heat exchangers, fin fans, pumps and compressors. * Pipe Fabrication * Pipe Installation including B31.1 and B31.3 * Mechanical Instrumentation


Employees

51-200

Links