Atle Dalsbø

Chief Information Security Officer at Lefdal Mine Datacenter

Atle Dalsbø has a range of work experience in various roles and companies. From 2016 onwards, they served as the Chief Information Security Officer at Lefdal Mine Datacenter AS, where they were responsible for information security, certifications, risk management, and training of employees. Atle also led the process of streamlining the company to comply with the EN 50600 standard and worked on documentation, quality control, compliance, and support in larger bids. Prior to this, they worked as the Compliance and Security Manager at the same company. Before joining Lefdal Mine Datacenter AS, Atle Dalsbø worked as the Manager of Business Development at LocalHost AS from 2010 to 2017. Atle also served as the Daglig leder (General Manager) at ADCom Nordfjord AS from 2008 to 2010.

Atle Dalsbø is currently pursuing a certification as a Certified Data Protection Officer from PECB, starting in 2018.

Links


Org chart

No direct reports

Teams

This person is not in any teams


Offices

This person is not in any offices


Lefdal Mine Datacenter

Our vision is to offer the most cost effective, secure, flexible and green data center solution in Europe. Several key differentiators build up our unique value proposition. Power – Renewable, stable and at low cost LMD is located near 350 MW renewable power production. The national grid is next to the facility with a capacity of 2 500 MW. Surplus power production in the region of 6.7 TWh. Long term power prices available at leading low cost. Effective cooling solution The LMD cooling solution will enable the facility to run with an industry leading PUE guaranteed between 1.08 and 1.15 depending on UPS configuration. Our water cooling enables 50 KW/rack. Leading green LMD is Europe’s greenest data center. In addition to running on renewable power and operating with low PUE, the CO2 emission is “0” and the footprint limited. The mine is already there and the material required to build out capacity is low. The main part of the facility is not visible to the surroundings. There is no need for evaporative systems for cooling and the WUE (Water Usage Effectiveness) is “0”. Flexibility – Growth, density and product solutions The flexibility is unique, with a “pay as you go” capacity. The size of the facility - 120.000 m2 whitespace - and the logistics allows different product solutions in a cost effective way. We can facilitate all known concepts for white space solutions and the facility structure enables a streamlined solution for containers in different shapes and sizes. LMD can customize power density, temperature, humidity, operational equipment, tier level and all related services. Time to market is 8 weeks for large scale capacity. Services up to IaaS are offered on pure lease models. High Security LMD is a Tier 3 data center service inside several secure mountain halls. The data is EMP protected. The facility has access from two single points of entry. This offers a high level of natural security and access control.


Employees

11-50

Links