ZM

Zach Manvilla

Prototype Engineering Manager at Signicast Investment Castings

Zach Manvilla is a seasoned professional in engineering with extensive experience in prototype and product development, currently serving as the Prototype Engineering Manager at Signicast Investment Castings since March 2020. In this role, Zach Manvilla focuses on delivering high-quality components for various industries, including aerospace, medical, and defense, prioritizing speed and service excellence. Previous positions at Signicast Investment Castings include Prototype Engineer, Product Development Engineer, and multiple roles in estimating and project engineering. Additional experience includes work as a Prototype Project Engineer/Estimator and an Estimating Engineering Intern. Zach Manvilla holds a degree in Industrial Technology Management from the University of Wisconsin-Platteville, attained in 2015.

Location

Milwaukee, United States

Links

Previous companies


Org chart


Teams

This person is not in any teams


Offices


Signicast Investment Castings

Signicast Investment Castings, a world-class provider of commercial steel investment castings provides customers a quality product on time at a competitive price. With quick lead times, on-time delivery, true just-in-time manufacturing, and unrivaled process control, Signicast has quickly become the top choice for OEM components in a wide range ofmarkets. In an industry where 12-week lead times are standard, Signicast has reduced that time to just 1 to 4 weeks. The result is true Just-In-Time manufacturing which eliminates costly inventory by allowing customers to receive small quantities of product, delivered frequently, according to their production schedule. Orders, even small ones, go from entry to shipping with no interruptions. Signicast operates 24 hours a day, seven days a week and schedules remain on-time. Signicast offers the best total value option for Complete-to-Print components. Signicast provides secondary operations such as machining, heat treatment, assembly, painting, finishing and packaging. The result is a high quality, high value product that is ready to ship from Signicast docks in as few as 4.3 days from start to finish. Early supplier involvement allows Signicast’s in-house technical staff to provide concurrent engineering during the formative stage of product design. Signicast’s engineering team is dedicated to providing customers with a design that will result in the lowest overall cost with design for manufacturability.