Tonaquint Data Centers
Carl Wilkins has a comprehensive work experience in the technology field. Carl currently holds the position of Vice President of Technology and Cloud at Tonaquint Data Centers, a role they have held since December 2023. Before that, they served as the Chief Technology Officer at the same company from February 2022 to December 2023. In this role, they were responsible for overseeing all technology aspects of the company, creating resource plans, and implementing technology solutions. Prior to Tonaquint Data Centers, Carl worked at Mountain America Credit Union as a Systems Team Manager from July 2017 to June 2020. Carl also held the position of Senior Systems Administrator at the same company from 2007 to 2017. Carl's earlier experience includes working as a Senior Systems Engineer at Weber State University from 2004 to 2007 and as a Network Manager at Utah Valley University from 2001 to 2004.
Carl Wilkins holds a Bachelor's degree in Computer Science from Utah Valley University. Carl has also obtained a certification as a VMware certified professional from VMware in 2022.
This person is not in any offices
Tonaquint Data Centers
Tonaquint, established 2008 in St. George, UT. TDC offers over 20,000 sq. ft. of data center space in our current facility located in the Tonaquint Business Park. Facility Size: Approximately 28,000 square feet Completed: 3rd Quarter, 2008. Raised floor area is 17,200 usable square feet. Floor Load: Typical structural capacity of 1250 pounds per square foot. Building Access: 24x7x365, Building Security: Video surveillance at all building entrances Shipping and receiving dock with remote monitored gate and secured storage Private parking area for all emploees and customers Monitored visitor parking Telecommunications: Zayo UTOPIA Tonaquint Century Link TDS Telecom South Central Level(3) Communicatoins Electric Lightwave Telecom Commercial Power: Utility Power 25MW primary substation 15MW secondary substation Total power plant 4MW Fuel Tank: Fuel storage for minimum 48-hr run time. Currently, 6,000+ gallons on site. Generators: Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units. Entire generator plant designed at N+1 redundancy. Fire Supression: FM200 VESDA (Very Early Smoke Detection Alarm) above and below floor. Double interlock pre-action throughout. HVAC: DX30 ton computer room air conditioner units. N+1 redundancy on all systems. Ceiling Heights: Typically finished 10 feet from raised floor.