Tonaquint Data Centers
Christopher Damrow possesses a robust background in facilities management and technical sales, currently serving as the Director of Facilities Management at Tonaquint Data Centers and as a Technical Sales Engineer at Drone Works/Flystrong. Prior experience includes roles as the Plant Maintenance Manager at Berry's Bullets and as a SCADA System Administrator at South Platte Water Renewal Partners, where responsibilities encompassed the administration of control systems and budgetary recommendations. Damrow's earlier positions at Xcel Energy and the Town of Castle Rock involved oversight of SCADA systems and support for system maintenance, troubleshooting, and programming, demonstrating a strong technical acumen in automation and instrumentation. Education includes a high school diploma from Jefferson High School.
This person is not in any teams
Tonaquint Data Centers
Tonaquint, established 2008 in St. George, UT. TDC offers over 20,000 sq. ft. of data center space in our current facility located in the Tonaquint Business Park. Facility Size: Approximately 28,000 square feet Completed: 3rd Quarter, 2008. Raised floor area is 17,200 usable square feet. Floor Load: Typical structural capacity of 1250 pounds per square foot. Building Access: 24x7x365, Building Security: Video surveillance at all building entrances Shipping and receiving dock with remote monitored gate and secured storage Private parking area for all emploees and customers Monitored visitor parking Telecommunications: Zayo UTOPIA Tonaquint Century Link TDS Telecom South Central Level(3) Communicatoins Electric Lightwave Telecom Commercial Power: Utility Power 25MW primary substation 15MW secondary substation Total power plant 4MW Fuel Tank: Fuel storage for minimum 48-hr run time. Currently, 6,000+ gallons on site. Generators: Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units. Entire generator plant designed at N+1 redundancy. Fire Supression: FM200 VESDA (Very Early Smoke Detection Alarm) above and below floor. Double interlock pre-action throughout. HVAC: DX30 ton computer room air conditioner units. N+1 redundancy on all systems. Ceiling Heights: Typically finished 10 feet from raised floor.