Tonaquint Data Centers
Gaurav Baveja has a diverse work experience spanning over 25 years. Gaurav currently serves as the Chief Financial Officer & Board Observer at Tonaquint Data Centers since February 2023. Prior to this, they held the same position at Vyntelligence from July 2021 to February 2023. Gaurav has also worked at Vonage, where they held various roles including SVP, Finance and Operations (CFO and COO), Applications Group from July 2019 to June 2021, VP, Corporate FP&A from January 2019 to June 2019, and Senior Director, Corporate Strategy and Development from September 2015 to December 2018. Before joining Vonage, they worked as the Director, Investment Banking; Mergers & Acquisitions in Technology + Telecom Sectors at Wells Fargo from January 2007 to August 2015. Gaurav also held positions at Merrill Lynch as Vice President, Business Analysis and Planning, Investment Banking Division from September 2005 to December 2006, at Deutsche Bank as AVP, Financial Controller, Global Markets from July 2002 to August 2005, and at Deloitte Consulting as a Senior Consultant from July 1997 to June 2002.
Gaurav Baveja holds a B. Tech degree in Electrical Engineering from the Indian Institute of Technology, Delhi, completed from 1993 to 1997. Gaurav also holds a Master of Business Administration (MBA) degree from Columbia Business School, which they obtained from 2004 to 2006.
This person is not in any offices
Tonaquint Data Centers
Tonaquint, established 2008 in St. George, UT. TDC offers over 20,000 sq. ft. of data center space in our current facility located in the Tonaquint Business Park. Facility Size: Approximately 28,000 square feet Completed: 3rd Quarter, 2008. Raised floor area is 17,200 usable square feet. Floor Load: Typical structural capacity of 1250 pounds per square foot. Building Access: 24x7x365, Building Security: Video surveillance at all building entrances Shipping and receiving dock with remote monitored gate and secured storage Private parking area for all emploees and customers Monitored visitor parking Telecommunications: Zayo UTOPIA Tonaquint Century Link TDS Telecom South Central Level(3) Communicatoins Electric Lightwave Telecom Commercial Power: Utility Power 25MW primary substation 15MW secondary substation Total power plant 4MW Fuel Tank: Fuel storage for minimum 48-hr run time. Currently, 6,000+ gallons on site. Generators: Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units. Entire generator plant designed at N+1 redundancy. Fire Supression: FM200 VESDA (Very Early Smoke Detection Alarm) above and below floor. Double interlock pre-action throughout. HVAC: DX30 ton computer room air conditioner units. N+1 redundancy on all systems. Ceiling Heights: Typically finished 10 feet from raised floor.