Badak LNG
Muammar Ammar has a diverse work experience in the field of plant operation and control. Muammar began their career at PT.Samsir Karya P as a Technician in 2001, where they worked on DCS retrofit projects for PT.Badak LNG. In 2002, they joined Badak LNG as a Field Operator Plant, where they were responsible for plant troubleshooting, data management, pump operation, and advisory on utility plant issues. Muammar also operated and controlled various plants and systems such as water treatment, nitrogen-producing, boiler, cooling water supply, sewage treatment, and community water supply. In 2015, they were promoted to the role of Chief Operator Process Train, further showcasing their expertise and leadership in the field.
Muammar Ammar's education history begins in 1996 when they attended Sekolah Menengah Kejuruan Negeri 1 Bontang East Borneo. Muammar pursued a degree in Industri Chemistry and completed their studies in 1999. In 1999, they also attended Balai Latihan Kerja Samarinda, where they obtained a degree in Instrument Teknisi. Most recently, from 2016 to 2018, Muammar Ammar attended Politeknik Negeri Samarinda, where they earned a degree in Teknik Kimia (Chemical Engineering).
This person is not in any offices
Badak LNG
The Badak LNG Project began when HUFFCO, a Production Sharing Contractor (PSC) of Pertamina, discovered a huge natural gas reserve at Badak Field, East Kalimantan in February 1972. On November 26, 1974, PT Badak NGL, a non-profit company with the Shareholders of Pertamina, VICO and JILCO was set up. This company is entrusted to operate and maintain the Badak LNG Plant. In 1980, construction commenced on Train C and D as LNG demand increased from the Japanese buyers. The of the LPG extraction facilities in 1988. The refrigerated LPG production is also dedicated to Japanese export. Due to the continuous increase of LNG demand in Japan, Taiwan, and Korea, then Train E was constructed in 1987-1989, while Train F was constructed in 1991-1993. Since 1992 some LNG productions from this LNG Plant have also been exported to South Korea. The development of the Badak LNG Plant had been continued by the construction of the Train G that was completed in 1997 and Train H which was completed in the end of 1999. By 8 train's operation, the production capacity is able to reach into ± 22.5 million tons LNG/year. In entering the third millenniums, the Badak LNG plant has developed and able to produce the biggest LNG production in the world. Up to December 13, 2011, Badak LNG plant had shipped the 8,000 LNG cargoes. To maintain buyers’ confidence for gas reserve quantity, a 42” pipe line is added. Four parallel pipelines which able to ship 3,600 million standard cubic feet (MMSCFD) natural gas to the plant for further process. Finally, Badak LNG plant become one of LNG plants with great experience in the world LNG industry, and become a vital asset for Indonesian LNG business chain. With all abilities, and experience for more than 40 years in producing LNG, Badak LNG ready to face any challenge in the 21st century, with strong and continuous support from all parties involved in LNG business.