Teerath Shivani

Cheif Operator (electrical Operation) at China Huadian

Teerath Shivani serves as the Chief Operator (Electrical Operation) at China Huadian Corporation for the 2x330 MW Engro's Coal Fired Power Plant at Thar Coal Block II, Islamkot Tharparkar, since June 2024. Previously, Teerath held the position of Electrical Deputy Chief Operator at CHD Power Plant Operation Co., Ltd. from September 2022 to June 2024 and worked as a Field Operator (Electrical Operation) at China Huadian Corporation from April 2021 to September 2022. Teerath's career began with an internship at Engro Fertilizers Limited in late 2019. Educational qualifications include a degree in Sub Engineering, specializing in Electrical Engineering Technologies/Technicians, obtained from Technical Training College Daharki between September 2017 and June 2020.

Links



Teams

This person is not in any teams