Petrogulf misr
Abdel Mohsen Abdel Atty is a seasoned Reservoir Engineer with extensive experience at Petrogulf Misr since September 2002, specializing in reservoir management and data consistency. Abdel Mohsen also contributed as a Reservoir Engineer at Zadco for a short tenure, focusing on preparing the annual report and assessing weak and intermittently producing wells in the Upper Zakum Reservoirs. Abdel Mohsen holds a Bachelor's degree in Petroleum Engineering from Cairo University, earned between 1996 and 2001.
This person is not in any offices
Petrogulf misr
Petrogulfmisr Fields are located in the Central Gulf of Suez, approximately 70 km north of Hurghada city. The concession area contains four (4) main Fields; North Geisum, North-East Geisum, South Geisum, and Tawila-West. The development and production of the Fields is supported by five fixed offshore structures (production platforms) and a jack-up structure (the Geisum Star). The total current daily oil production rate averages some 7,000 BOPD with an associated water cut of approximately 78% adding-up to a total liquid production rate in the order of 31,800 BLPD. The average composite gravity of the export oil is some 28 API.