Patrick is a Chartered Structural Engineer with over 10 years of structural engineering experience. His experience is focused on the design and analysis of heavy civil infrastructure. He is experienced in design at all stages of development, advanced structural analysis techniques (including non-linear materials, staged construction, dynamic response, spectral analysis, kinematics), and project/design management. Patrick has worked in the design teams of a variety of heavy civil infrastructure projects including Kowloon West Terminus (Hong Kong), Bank Station Capacity Upgrade and CrossRail (both London, UK), Legacy Way (Brisbane, Aus), and West Gate Bridge Strengthening (Melbourne, Aus) as well a leading/assisting with numerous bridge, maritime and mining projects between these. Since joining the RBG Construction Engineering division, Patrick has worked on a number of civil infrastructure projects as a Temporary Works Design Coordinator and Lead Structural Designer. Recent projects include Construction phase support on the Queanbeyan River Bridge and Temporary works design on level crossing removal projects.
Sign up to view 0 direct reports
Get started