Tonaquint Data Centers
Allan Pudlitzke is a seasoned technology professional with extensive experience in cloud engineering and IT consulting. Currently serving as a Senior Cloud Engineer at Tonaquint Data Centers, Allan has previously held key roles at AMP Digital Studio, providing web design and digital media services since 2015, and SWK Technologies, where responsibilities included cloud operations and project management from 2018 to November 2023. Additional experience includes roles at Nellnube as a Cloud Engineer, On Demand IT as a Technical Account Manager, and NOTINDOOR Photography Magazine as COO, showcasing a diverse skill set in project management, cloud systems administration, and customer relationship management. Allan holds a Bachelor of Arts in Business Administration and Management Information Systems from Washington State University and an Associate of Arts in Business Administration from Clark College.
This person is not in any offices
Tonaquint Data Centers
Tonaquint, established 2008 in St. George, UT. TDC offers over 20,000 sq. ft. of data center space in our current facility located in the Tonaquint Business Park. Facility Size: Approximately 28,000 square feet Completed: 3rd Quarter, 2008. Raised floor area is 17,200 usable square feet. Floor Load: Typical structural capacity of 1250 pounds per square foot. Building Access: 24x7x365, Building Security: Video surveillance at all building entrances Shipping and receiving dock with remote monitored gate and secured storage Private parking area for all emploees and customers Monitored visitor parking Telecommunications: Zayo UTOPIA Tonaquint Century Link TDS Telecom South Central Level(3) Communicatoins Electric Lightwave Telecom Commercial Power: Utility Power 25MW primary substation 15MW secondary substation Total power plant 4MW Fuel Tank: Fuel storage for minimum 48-hr run time. Currently, 6,000+ gallons on site. Generators: Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units. Entire generator plant designed at N+1 redundancy. Fire Supression: FM200 VESDA (Very Early Smoke Detection Alarm) above and below floor. Double interlock pre-action throughout. HVAC: DX30 ton computer room air conditioner units. N+1 redundancy on all systems. Ceiling Heights: Typically finished 10 feet from raised floor.