Ariane Lefebvre

Powerplant Engineer at VistaJet

Ariane Lefebvre's work experience includes a role as a Powerplant Engineer at VistaJet starting in July 2022. Prior to that, they worked as a Planning Engineer at Global Jet Luxembourg from September 2021 to June 2022, where their responsibilities included reviewing technical logs, analyzing flight logs, and performing liaise with crews and Hot Line Engineering. Ariane also interned as a CAMO Intern at Air Service Basel from March 2021 to July 2021, and as a CAMO Intern at AMAC Aerospace Switzerland AG in both 2020 and 2019. Ariane'searliest internship was at SR Technics Group, where they worked as an intern from November 2016 to February 2018.

Ariane Lefebvre's education history is as follows:

From 2020 to 2021, Ariane attended Université Toulouse - Jean Jaurès and obtained a Vocational Bachelor's Degree in Aeronautical Maintenance.

Prior to that, from 2018 to 2020, they attended Lycée Saint-Exupéry (Blagnac) and earned an Associate's degree in Aeronautics.

From 2015 to 2018, Ariane attended Lycée Tristan Corbière (Morlaix) and obtained a Vocational High School Diploma in Aeronautics (systems option).

In addition to their formal education, Ariane has also obtained various certifications. In April 2023, they completed the Bombardier BD-700 Series (RRD BR700-710) C Type Training Course at AMS AERO. Ariane also completed the Virtual Academic Diagnostics Trend Interpretation course at GE Aerospace in April 2023.

In March 2022, Ariane completed several certification courses, including EASA Part CAMO - Safety management systems - Regulatory obligations, EASA Part CAMO Regulatory Obligations, and Part M Effective Mar 2020 - For large aircraft at Sofema Aviation Services.

In February 2022, they completed the Electrical Wiring Interconnection System TG 1&2 course at Bostonair, and in December 2021, they completed the Gulfstream GVII (P&WC PW800 Series) Familiarization Course at FlightSafety International.

Prior to this, they also completed several certification courses in 2021 and 2022, including ETOPS for maintenance, Electrical Wiring Interconnection System TG 4&5, Fuel Tank Safety Phase 1&2, Maintenance Human Factors Continuation, Part 145 - Production planning essentials, and Part M - Maintenance planning essentials, all at Bostonair.

Links

Timeline

  • Powerplant Engineer

    July, 2022 - present